How a closed mall site is being replanned into a transit-linked mixed-use district

How a closed mall site is being replanned into a transit-linked mixed-use district

In Gaithersburg, Maryland, work has begun on the redevelopment of the former Lakeforest Mall site, marking the transition of a 102-acre retail property into a mixed-use district structured around housing, commercial space and public infrastructure. The project follows the closure of the mall in 2023 and introduces a phased plan that replaces large-format retail and surface parking with a more compact urban layout.

The development is being led by US-based real estate developer WRS, with construction activity currently focused on early-stage works such as demolition, road networks and stormwater systems. Vertical construction of initial residential and retail buildings is expected to follow.

From enclosed retail to a mixed-use development framework

Lakeforest Redevelopment by WRS
Lakeforest Mall site begins its transition into a 102-acre mixed-use district in Gaithersburg. Image: Courtesy of WRS

The redevelopment plan replaces approximately 1.1 million square feet of existing retail space with a programme that combines residential, commercial and community uses within a single site. A total of 1,600 residential units are planned, comprising around 850 rental units and 750 homes for sale, including townhomes, stacked duplexes and condominiums.

Construction responsibilities are distributed across multiple participants. NVR, a national homebuilder, is set to deliver approximately 600 for-sale homes. A yet-to-be-announced partner will work alongside WRS on approximately 600 rental units, while Potomac Housing Development is responsible for 250 workforce housing apartments.

Retail and commercial space will extend to more than 470,000ft2. Initial tenants include The Home Depot, Sprouts Farmers Market and Landmark Theatres. The plan also includes an entertainment-focused area designed to accommodate restaurants, smaller retail units and flexible community spaces.

Integration of transit and site infrastructure

A central component of the scheme is the relocation and upgrade of the Lakeforest Transit Center. The facility is being developed in coordination with Montgomery County and is intended to serve eight Ride On bus routes, while also functioning as a primary node for the planned MD 355 Flash Bus Rapid Transit system.

The site layout introduces a network of streets designed to support pedestrian movement and connectivity with surrounding neighbourhoods. This includes provision for cycling routes and links to adjacent areas, alongside supporting infrastructure delivered during the initial phases of construction.

Public space and phased delivery approach

The plan allocates more than 35 acres to open space, including landscaped areas, public gathering zones and a boardwalk around existing ponds that are being incorporated into the redevelopment. These elements form part of a broader effort to structure the site around accessible outdoor areas alongside built uses.

Construction is being implemented in phases, beginning with site preparation and infrastructure. Subsequent stages are expected to bring forward residential buildings and retail blocks in sequence, aligning with the overall development framework.

At full buildout, the project is projected to generate $2.7m in annual recurring revenue for the City of Gaithersburg and an estimated $1.7bn in annual economic output. The redevelopment represents a shift in the use of the site from a single-use retail complex to a multi-component urban district organised around housing, commerce and transit connectivity.

Share this article:

Contact Us